Completed Projects Photo Gallery 1

Rundle Place

​​
Category:        Retail   
Builder            Hansen and Yuncken     
Material:         Stramit's Speed Deck Ultra with    

                         FarLap(R) and CSR thermodeck

                         spacer
Location:         Adelaide SA
Built:                2013
Project Size:   2800Sqm Roofing

 

 

 

 

80 Grenfell Street - Tower

Level 15 Metallic shadowline cladding and King Klip 700 roofing on CSR Ashgrid compling with section J

 

“TAFE SA, Regency Campus, Mining, Engineering and
   Transport Centre”

​​
Designed by “Greenway Architects SA”.

Roof Maintenance - Penetrations to existing building to make way for new services and construction of new Mining, engineering and transport Centre using King Klip roofing and Aramax Roofing.

December 2013 Update

Stage 1 & 2 Complete on time and defect free at hand over. Another quality build with our client Hansen & Yuncken. Onsite milling of both the ARAMAX and King Klip profile through Fielders was well planned and perfectly executed. Conditions where harsh and safety was paramount, risk assessments, SWMS and Process Audits where conducted progressively throughout this uniquely designed facility.

Parks Community Centre

​​

Stage 1 & 2 of the Community centre redevelopment is now complete. Built Environs Managing Contractor Design and Construct project using Fielders Finesse range Shadow line 305 in both Zinc Next Generation AM 125, and Colorbond Next Generation coil. Using the Next Generation Coil from Bluescope increased the warranty period to 36 years. Our QHSE system ensured a defect free project at hand over and injury free work place. Well done to the Alien onsite team for an outstanding achievement. Further works programmed to resume in January

 
Aria Apartments

 

Category:        Apartments  
Builder            Tagara Builders     
Material:         Palram Sunpal panels and roofing,

                         Fielders Finesse panels, King Klip

                         roof sheeting
Location:         Adelaide SA
Built:                2014 - 2015
 

 
Taylors Winery

​​

 

Works completed to make Taylor's OH&S compliant by installing internal thermal panel.

 

 
Mayfair Hotel

​​

 

Category:        Heritage Renovation   
Builder            Watpac     
Location:         Adelaide SA
Built:                2014
                         Level 14 and 15 heritage roof tile

                         restoration and New roof to Side

                         Pod roof with Marine ply

                         substructure. Heritage replacement

                         of front facade to canopy

                         constructed from marine ply

                         substructure with powder coated

                         1.6mm bonded covering

 

 

 
Zen Apartments

​​

 

Category:         Apartment Building   
Builder             AGC Projects  
Material:          Ampelite roofing,

                          Alucobond cladding, mini orb cladding.

Location:         Adelaide SA
Built:                Currently still under construction                                       2015
Project Size:    330m2 mini orb cladding & facade.

                          230m2 alucobond cladding, facade &                               soffit linings.

                          120m2 roofing

 

 

 

© 2016 by Alien Roofing Contractors

  • facebook